Thứ năm, 16/04/2026 | 10:18
Abstract: Now in the Vietnam, there are abaunt 40 thermal power planhts. In this are abaunt 80 boiners. Equip a boiner with 3 water bumps, make certain to supply day ofter day. At that in bulk there are 240 water bumps. Now 1,000,000 USD the water bump have to import from US and other contries, FOB time shipment todetination, delivery on 6 - 8 months. When one of main bump detalls (Bump spindle, bump propeller, balance detall) be out of oder then the bump and boiner stop. It is power production heavy casualties of power plannt and National. Research and design water bump for solution in the Vietnam, it is important proplem. National Engineer group of National Research Institute for Mecanical Engenering of Ministry of Industry finished solution for water bump and comput it in power production with equlvalence technical parametes of new bump. Keywords: Boiner thermal power plant water bump, Design, solution |
Sự ra đời của Nghị quyết số 57-NQ/TW ngày 22/12/2024 của Bộ Chính trị đã đánh dấu bước ngoặt quan trọng trong tư duy và định hướng phát triển khoa học, công nghệ, đổi mới sáng tạo và chuyển đổi số. Không chỉ mang ý nghĩa chiến lược ở tầm quốc gia, nghị quyết còn mở ra “thời cơ vàng” để các địa phương tận dụng tiềm năng, bứt phá mạnh mẽ, nâng cao năng lực cạnh tranh và hướng tới phát triển bền vững trong bối cảnh kinh tế số và cách mạng công nghiệp 4.0.
16/04/2026