Thứ hai, 04/08/2025 | 04:39
Abstract: Now in the Vietnam, there are abaunt 40 thermal power planhts. In this are abaunt 80 boiners. Equip a boiner with 3 water bumps, make certain to supply day ofter day. At that in bulk there are 240 water bumps. Now 1,000,000 USD the water bump have to import from US and other contries, FOB time shipment todetination, delivery on 6 - 8 months. When one of main bump detalls (Bump spindle, bump propeller, balance detall) be out of oder then the bump and boiner stop. It is power production heavy casualties of power plannt and National. Research and design water bump for solution in the Vietnam, it is important proplem. National Engineer group of National Research Institute for Mecanical Engenering of Ministry of Industry finished solution for water bump and comput it in power production with equlvalence technical parametes of new bump. Keywords: Boiner thermal power plant water bump, Design, solution |
Phát triển doanh nghiệp khoa học và công nghệ (KHCN) là chủ trương lớn của Đảng, Nhà nước nhằm nâng cao chất lượng hiệu quả sản xuất kinh doanh, tạo động lực bền vững cho phát triển kinh tế - xã hội trong cuộc cách mạng công nghiệp 4.0.
01/08/2025